|
- SUBDIVISION PLAN GUIDE - kaingaora. govt. nz
Usually, an approved survey plan must be deposited within 3 years of the issue of a s223, subsequent s223 certificates can be obtained where a new plan is submitted, but only if the subdivision consent has not lapsed
- Selwyn District Council - Subdivisions
The plan will need to show the size and location of the new lots, the location of any current buildings, roads and significant natural areas (including springs, streams, water races, reserves and easements) as well as any other information that we may require to assess the effect of the subdivision on the environment
- Subdivision – Urban - Auckland Council
Auckland Unitary Plan Operative in part 7 (d) creation of esplanade strips can secure public benefits and resource management objectives without alienating land from private ownership;
- How To Read Site Plan: Symbols and Details
We are going to list and explain each symbol that is going to be on your site plan Also, if you have some additional questions regarding how to read a site plan, we offer some simple and easy to follow guidelines that will help you 1 Address and legal information of the property – Parcel ID (APN#) and Lot Area 2 Paper size 3 Vicinity map 4
- Guidance Note: Preparation of site plans - waipadc. govt. nz
Position of any eaves in relation to any access, ROW, or driveways Identification of building platform(s) shape factor to the standard and size dimension specified in the respective District Plan
- Scheme Plan and other subdivision requirements - Marlborough
The topographical detail shown on a rural Scheme Plan does not need to be as detailed as that required for an urban subdivision Sufficient data of the same nature as that set out in “Other relevant site details” should be shown for the indicative building site and any proposed access
- Subdivision and Development Principles and Requirements 2014
Schedule 3: Altered Requirements to Section 3 NZS 4404:2010 Roads 19 Schedule 4: Altered Requirements to Section 4 NZS 4404:2010 Stormwater 20 Schedule 5: Altered Requirements to Section 5: NZS 4404:2010 Wastewater 21 Schedule 6: Altered Requirements to Section 6: NZS 4404:2010 Water Supply 22
- Scheme Plan Design - Land Surveyors
We will prepare a scheme plan that indicates all new lot dimensions and areas The plan will show any easement positions that may be required along with a memorandum of easements schedule
|
|
|