- Reg: Bom quantity - SAP Community
Hi PP Guru's , I have BOM for FERT in which I have included 2 other Assembly Boms after MRP when I checked in MD04 the quantity for FERT is coming correct to 2 Pcs But for Assembly it is coming 0
- Validation of batch nos. in migo for finished goods (fert)
I want to validate batch number entered by user at the time of migo for finished goods (fert) against the batchs in mcha how can i do this? also is it possible to give f4 help to user for available b
- scrap material - SAP Community
I am using material type for daily transaction ROh, HAlb, FErt, i have created zscap material type for scrap transaction at all stages after routing on the roh say out of 10 matrials , 2 mat are scrap so now my client wants this halb material should be convert in to zscrap material type after that it will further proceed for sale
- In-process Inspection in Process Industry | SAP Community
Scenario: there are 10 reactors in line for a process, once I raised the order of a matrial, at the first reactor I add all the ROH and HALB required for that FERT, now the mixture is transfered to Reactor no 2 but before transferring, they want to check some test say solubility If solubility is 1 then transfer to next reactor or if it is less the stirr in reactor no 1 for some more time
- Standard cost estimation - SAP Community
Hi, while creating standard cost estimation do we require fert material should have valuation type and price for Standard variable price If we run cost estimation for the fert hw the cost will be cal
- How to move dublicate records from one internal table to another table
ZYX FERT M 9620075 ZHLB M 9620075 ZHLB M Here i need to move the material into another internal table which comes more than once That means here i need to move 123te and 9620075 into another internal table Can any one help this? Mohana
- single raw material with output of 2 finish product
In our scenario, we have the pressing machine which have the dye to create the right and left bumper of the car in a single stock if we give the single raw material , the ouput will be two finish products 1 right bumper and 2 left bumper while confirming the order, how we can get two fert?
- Problem in Process order confirmation ( while doing batch splitting . . .
Problem in Process order confirmation ( while doing batch splitting) 30 Views Follow RSS Feed Hi All In our Industry we have sceneraio we create Internal order and assign internal order to sales order Once MRP run take place Planned order created and converted to process order Process order released once we try to do confirmation of process order example suppose process order header matl qty
|
|
|