companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories














  • Document Accession #: 20230126-3090 Filed Date: 01 26 2023 - PJM
    On December 2, 2022, as supplemented on January 25, 2023, PJM Interconnection, L L C (PJM) submitted an executed Interconnection Service Agreement (ISA) among PJM as Transmission Provider, Chester Solar Technology Park, LLC as Interconnection Customer, and Virginia Electric and Power Company as Interconnected Transmission Owner (Chester Solar ISA), designated as Original Service Agreement
  • PJM - Territory Served
    PJM Interconnection coordinates the movement of electricity through all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia Map of PJM territory served nbsp PDF (6MB)
  • PJM - Maps
    PJM is now offering high-resolution transmission maps that include PJM's transmission infrastructure from 69 kilovolt to 765 kilovolt facilities These maps contain detailed inserts of Philadelphia Jersey City Corridor, Chicago, Pittsburgh, Dayton Columbus Metro, Cleveland, Norfolk, and Baltimore DC Metro Order or download printable maps Download Maps (Members and Authorized Users) If
  • PJM Website
    On July 11, 2025, in Docket No ER25-2827-000, PJM submitted on behalf of FirstEnergy Service Company (FirstEnergy), on behalf of Potomac Edison Company and American Transmission Systems, Inc a request for authorization to recover 100 percent of prudently incurred construction costs associated with investment in certain transmission projects identified by PJM Interconnection, L L C , in the
  • PJM LOAD FORECAST REPORT
    PJM LOAD FORECAST REPORT
  • PJM General Slides
    In PJM, natural gas and coal are 49% and 21% of total installed capacity, while nuclear represents 18%
  • Dominion Energy Virginia—Electric Transmission Facility Interconnection . . .
    To ensure that the DEV-ET system continues to meet its operational objectives, DEV-ET performs studies to evaluate existing interconnections seeking to make a qualified change as defined by the Planning Coordinator (PC) The Planning Coordinator, PJM, defines qualified change in PJM Manual 14b, Section G 12 NERC Standard FAC-002–Facility Interconnection Studies These changes may come in the
  • 2021 Virginia State Infrastructure Report (January 1, 2021 December 31 . . .
    Transmission Infrastructure Analysis Please note that PJM is now listing all transmission projects in its Annual RTEP and state infrastructure reports, beginning with this year’s 2021 Annual RTEP In previous years only projects above a $10 million threshold were listed in the Annual RTEP Report and projects above a $5 million threshold were listed in the state infrastructure reports This




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer