copy and paste this google map to your website or blog!
Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples: WordPress Example, Blogger Example)
Connect — C-D CONSTRUCTION We're here for you as a proven leader in Government, Commercial, Marine, Industrial and Residential construction We understand safety is paramount and we have been acknowledged for our exemplary safety practices by owners including the Department of the Army, Mobile District Corps of Engineers with the achievement of a Zero “Lost Time
Services — C-D CONSTRUCTION C D can produce jobs from the very beginning to end In all of the construction development processes, C D has provided excellent design-build services to many satisfied customers
St. Johns River Ferry - C-D CONSTRUCTION To date, C D has completed 4 phases of renovations to the JTA Ferry System Over 19 million dollars of modernization has been completed The scope of work has comprised of repairs to the existing ferry slip walls, fenders, walkways, bulkheads, bridges, gantries, a new utility building and a new restroom facility
C-D CONSTRUCTION C D Construction Inc was incorporated in 1992, by Curtis Deen as a State of Florida Certified General Contractor and specialty Marine Contractor C D is also a Design Build Contractor capable of providing all construction and Engineering Services
About — C-D CONSTRUCTION C D Construction has extensive knowledge in Government contracting and has developed strong working relationships with some of the following agencies: Department of the Army, Department of the Air Force, Department of the Navy, United States Coast Guard, Space Gateway Support, LLC, Lockheed Martin, the Federal Highway Administration, the
The Coast to Coast Trailhead at Parrish Park - C-D CONSTRUCTION Parrish Park Project Titusville, Florida - C D Construction is currently working on the Coast to Coast Trailhead project at Parrish Park Located on the Max Brewer Causeway in Titusville Florida This development features a 1,300-foot roadway designed for public accessibility, complete with an arched drain system for effective water containment
Florida Power Light Energy Center — C-D CONSTRUCTION Florida Power Light Cape Canaveral Energy Center Storm Surge Protection Cocoa, Florida - Working with TLC Engineering for Architecture and Freck Enterprises, C D Construction completed this Design-Build project in December, 2014
Space Coast Regional Airport Hangar — C-D CONSTRUCTION East Side Aircraft Hangar at Space Coast Regional Airport Titusville, Florida - Completed in April 2016 for the Titusville-Cocoa Airport Authority, the construction of a 11,700 square-foot aircraft maintenance hangar with a 2,160 square-foot lean-to shell space for a future up-fit, an asphalt parking lot, storm drainage, sidewalks, water and
Cruise Terminal #10 - C-D CONSTRUCTION Extensive heavy marine construction was required including the installation of thirty 3’ diameter by 100’ long steel piles driven through holes cut in the existing wharf for structural support of the building
City of Cocoa Water Tower - C-D CONSTRUCTION The scope of work included fabrication, construction, tuning, inspecting and repairs to the steel elevated water storage tank reinforcement rods All temporary work, including welding and attachments to the existing structure were repaired to original condition