Connect - C-D CONSTRUCTION We're here for you as a proven leader in Government, Commercial, Marine, Industrial and Residential construction We understand safety is paramount and we have been acknowledged for our exemplary safety practices by owners including the Department of the Army, Mobile District Corps of Engineers with the achievement of a Zero “Lost Time
C-D CONSTRUCTION C D Construction Inc was incorporated in 1992, by Curtis Deen as a State of Florida Certified General Contractor and specialty Marine Contractor C D is also a Design Build Contractor capable of providing all construction and Engineering Services
The Coast to Coast Trailhead at Parrish Park — C-D . . . - C-D CONSTRUCTION C D Construction is currently working on the Coast to Coast Trailhead project at Parrish Park Located on the Max Brewer Causeway in Titusville Florida This development features a 1,300-foot roadway designed for public accessibility, complete with an arched drain system for effective water containment
Cruise Terminal #10 — C-D CONSTRUCTION An engineered EEFCO formwork system was used to allow the tractor-trailer trucks supplying the cruise ships the ability to operate under and through our construction site The project was completed on schedule and without interruption of the regular cruise ship dock preparations
Florida Power Light Energy Center — C-D CONSTRUCTION Florida Power Light Cape Canaveral Energy Center Storm Surge Protection Cocoa, Florida - Working with TLC Engineering for Architecture and Freck Enterprises, C D Construction completed this Design-Build project in December, 2014
St. Johns River Ferry — C-D CONSTRUCTION The ferry crosses 2 5 miles inland of the river’s mouth and runs every half hour To date, C D has completed 4 phases of renovations to the JTA Ferry System Over 19 million dollars of modernization has been completed
Aeromed Training Facility — C-D CONSTRUCTION Scheduling was crucial for relocating employees while construction was underway Numerous unforeseen conditions increased the scope of work, however, C D partnered with all agencies involved to coordinate work and finished ahead of schedule on this project