companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

GARAGE ROLAND PAQUETTE

ROUGEMONT-Canada

Company Name:
Corporate Name:
GARAGE ROLAND PAQUETTE
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 1330 Rang Double,ROUGEMONT,QC,Canada 
ZIP Code:
Postal Code:
J0L1M0 
Telephone Number: 4504693590 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
753201 
USA SIC Description:
Automobile Body-Repairing & Painting 
Number of Employees:
1 to 4 
Sales Amount:
Less than $500,000 
Credit History:
Credit Report:
Good 
Contact Person:
Roland Paquette 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
GAZ BAR 4 CHEMINS ENR
GARDERIE LA POMME ENCHANTEE
GARAGE ROUGEMONT DIESEL INC
Next company profile:
GARAGE RELAIS DE LESSENCE MONT
GARAGE REAL BARRE INC
GARAGE GERALD BRODEUR










Company News:
  • Minimum Floor Slope for Drainage - The Building Code Forum
    The building code requires that a garage floor be sloped towards the door, but does not specify a minimum slope It is usually 1 8” to 1 4” per foot Here is the citation from the International Residential Code (IRC):
  • 2024 Portal Frames - The Building Code Forum
    By code, one could use a portal frame to support a 20’ wide garage door, but not this case with a much smaller opening If the three windows were replaced with a triple, mulled unit, I would assume it would be acceptable, which seems somewhat ridiculous Portal frames are not just used for garage doors (except for the PFG)
  • Vehicle storage - The Building Code Forum
    1 Buildings having two or more stories above grade plane, including basements, with a fire area containing a repair garage exceeding 10,000 square feet (929 m2) 2 Buildings not more than one story above grade plane, with a fire area containing a repair garage exceeding 12,000 square feet (1115 m2) 3
  • Egress through a garage. - The Building Code Forum
    Individual wants to build a free standing garage which is accessory to the main dwelling A part of the garage is a game room In this game room there will be an emergency escape window However to egress this game room you would have to travel through the garage 311 1 is clear egress through the garage is prohibited
  • Ventilation System For Lube Pit | The Building Code Forum
    Floor areas in major repair garage up to 18" AFF are considered classified, unless 4 ACH mechanical ventilation is provided and the vents for exhaust and makeup air are within 12" of the floor Ventilation must be continuous during occupied hours [F] 502 15 Repair garages
  • S-1 occupancy, occupant load | The Building Code Forum
    2015 IBC, table 1004 1 2, what does a s-1 storage occupancy (repair garage with ordinary hazard) fall under for the occupant load factor? im thinking industrial at 200 sf per person
  • Repair Garage Ventilation - The Building Code Forum
    What section in the 2009 IMC allows for CO detection to be the sole method to activate the required ventilation system in a 12,000 sf repair garage? Does 404 1 apply? This is not a parking garage, it is a repair garage Is the system only required to run when CO detectors are activated? What standard determines the ppm level that activates the
  • Vehicle Repair and Sand Oil Separators - The Building Code Forum
    Garage [ RE: Section 301 3, `12 IPC ] The number of Floor Drains and or Trench Drains will depend on how much floor area will be used to service, repair or wash vehicles [ RE: Section 1003 2, 1003 4 1 1003 4 2, `12 IPC ] Someone will have to design your total amount of areas that will be considered for use, select an approved number of
  • Residential service pit - The Building Code Forum
    How does a hole in the garage floor comply with this::: 406 3 3 Garage Floor Surfaces Garage floor surfaces shall be of approved noncombustible material The area of floor used for parking of automobiles or other vehicles shall be sloped to facilitate the movement of liquids to a drain or toward the main vehicle entry doorway
  • Coiling Overhead Door as Egress Door - The Building Code Forum
    I'm pondering when I can use an overhead door as an exit The CBC is pretty clear (1010 1 2) that a swinging door isn't required in a garage factory storage use if the space is small (less than 10 occ ) Think storage unit But there is also an exception for power-operated doors complying with 1010 1 4 2




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer