ibc engineering services, inc. is an award winning engineering firm based in waukesha, wisconsin. our business is designing and commissioning energy efficient and sustainable mechanical, electrical, plumbing and fire protection systems.
Keywords to Search:
Company Address:
N8w22195 Johnson Dr,WAUKESHA,WI,USA
ZIP Code: Postal Code:
53186-1825
Telephone Number:
2625491620 (+1-262-549-1620)
Fax Number:
2625491190 (+1-262-549-1190)
Website:
www. ibcengineering. com
Email:
USA SIC Code(Standard Industrial Classification Code):
copy and paste this google map to your website or blog!
Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples: WordPress Example, Blogger Example)
Area Calculation Clarification - The Building Code Forum I have a somewhat basic (dumb?) question about area calculations - Reading through the 2009 IBC it defines building area as: 502 1AREA, BUILDING The area included within surrounding exterior walls (or exterior walls and fire walls) exclusive of vent shafts and courts Areas of the building
Door Encroachment Into Egress Corridor - The Building Code Forum IBC 2012 1005 7 1 states "Doors, when fully opened, shall not reduce the required width by more than 7 inches " If I have a door that when swung open 180 degrees is clear of the required corridor width, but when open at 90 degrees encroaches more than 7" into the required corridor width, is it
Changes in the 2024 International Building Code (IBC) The 2024 IBC® contains many important changes such as: Duties and powers of the building official: an overall reformat of Section 104 regulating duties of the building official, the approach for reviewing for code compliance has been significantly updated to reflect the current manner that alternate materials, designs and methods are evaluated
Fire Separation Distance Between New and Existing Building with Windows From the 2021 IBC Commentary: The Commentary says: Fire separation distance is the distance from the exterior wall of the building to one of the three following locations, measured perpendicular to the exterior wall face: an interior lot line [see Commentary Figure 202 (19)]; the centerline of a street or public way [see
Occupancy Classification for Townhouse: R-2 or R-3? R-2: "Residential occupancies containing more than two dwelling units" If each townhouse is a seperate structure, than it only contains one dwelling unit That makes it R-3, yes?
Egress through Intervening Spaces - The Building Code Forum It was mentioned that the path cannot cross through intervening spaces The large room is the Multipurpose Gym I've been making evac signs as such for a while and this is the first I've heard of it Reading the building code for this is extremely confusing the way they word things and was hoping someone might be able to shed some light 1016 2Egress through intervening spaces Egress through
Intermediate handrails - minimum clear width? - The Building Code Forum Does the IBC have a similar provision that clarifies the minimum width between handrails when an intermediate handrail is used? I couldn't find one Note, the building is fully sprinklered so it is my understanding that under exception (2) the 48" minimum width between handrails required for a stair to be "accessible" per 1009 3 does not apply
Water Fountain Substitution - The Building Code Forum 2009 IBC 2012 IBC Chapter 11 2009 IPC 2009 ICC A117 1 A117 1 requires one low and one high water fountain IPC Section 410 allows 50% of drinking fountains to be replaced by water coolers or bottled water dispensers in non-restaurant occupancies 410 1 Approval Drinking fountains shall
Fire Separation to property line - The Building Code Forum Reading IBC table 706 4 party walls requires 3-hr, but footnote “a” reduces to 2-hr But the north and south walls are within 10’ from the property line, are they required to be 1-hr as per Table 602? OR is it because the west wall abuts at 90 degrees then the north south wall is protected by the 2-hr west wall?