companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

IBC ENGINEERING SVC

WAUKESHA-USA

Company Name:
Corporate Name:
IBC ENGINEERING SVC
Company Title: IBC Engineering 
Company Description: ibc engineering services, inc. is an award winning engineering firm based in waukesha, wisconsin. our business is designing and commissioning energy efficient and sustainable mechanical, electrical, plumbing and fire protection systems. 
Keywords to Search:  
Company Address: N8w22195 Johnson Dr,WAUKESHA,WI,USA 
ZIP Code:
Postal Code:
53186-1825 
Telephone Number: 2625491620 (+1-262-549-1620) 
Fax Number: 2625491190 (+1-262-549-1190) 
Website:
www. ibcengineering. com 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
871133 
USA SIC Description:
Engineers-Professional 
Number of Employees:
 
Sales Amount:
 
Credit History:
Credit Report:
 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
LAKELAND SUPPLY INC
A TO Z PRINTING CO INC
KUETTNER MOTORS
Next company profile:
FLOORCARE USA INC
NIBA-THE BELTING ASSOCIATION
LEE JOHNS CATERING










Company News:
  • Area Calculation Clarification - The Building Code Forum
    I have a somewhat basic (dumb?) question about area calculations - Reading through the 2009 IBC it defines building area as: 502 1AREA, BUILDING The area included within surrounding exterior walls (or exterior walls and fire walls) exclusive of vent shafts and courts Areas of the building
  • Door Encroachment Into Egress Corridor - The Building Code Forum
    IBC 2012 1005 7 1 states "Doors, when fully opened, shall not reduce the required width by more than 7 inches " If I have a door that when swung open 180 degrees is clear of the required corridor width, but when open at 90 degrees encroaches more than 7" into the required corridor width, is it
  • Changes in the 2024 International Building Code (IBC)
    The 2024 IBC® contains many important changes such as: Duties and powers of the building official: an overall reformat of Section 104 regulating duties of the building official, the approach for reviewing for code compliance has been significantly updated to reflect the current manner that alternate materials, designs and methods are evaluated
  • Fire Separation Distance Between New and Existing Building with Windows
    From the 2021 IBC Commentary: The Commentary says: Fire separation distance is the distance from the exterior wall of the building to one of the three following locations, measured perpendicular to the exterior wall face: an interior lot line [see Commentary Figure 202 (19)]; the centerline of a street or public way [see
  • Fire rating of electrical equipment rooms - The Building Code Forum
    Could anyone direct me to an IBC or NFPA code regarding the rating of electrical equipment rooms In our jurisdiction, we routinely expect at least a
  • Occupancy Classification for Townhouse: R-2 or R-3?
    R-2: "Residential occupancies containing more than two dwelling units" If each townhouse is a seperate structure, than it only contains one dwelling unit That makes it R-3, yes?
  • Egress through Intervening Spaces - The Building Code Forum
    It was mentioned that the path cannot cross through intervening spaces The large room is the Multipurpose Gym I've been making evac signs as such for a while and this is the first I've heard of it Reading the building code for this is extremely confusing the way they word things and was hoping someone might be able to shed some light 1016 2Egress through intervening spaces Egress through
  • Intermediate handrails - minimum clear width? - The Building Code Forum
    Does the IBC have a similar provision that clarifies the minimum width between handrails when an intermediate handrail is used? I couldn't find one Note, the building is fully sprinklered so it is my understanding that under exception (2) the 48" minimum width between handrails required for a stair to be "accessible" per 1009 3 does not apply
  • Water Fountain Substitution - The Building Code Forum
    2009 IBC 2012 IBC Chapter 11 2009 IPC 2009 ICC A117 1 A117 1 requires one low and one high water fountain IPC Section 410 allows 50% of drinking fountains to be replaced by water coolers or bottled water dispensers in non-restaurant occupancies 410 1 Approval Drinking fountains shall
  • Fire Separation to property line - The Building Code Forum
    Reading IBC table 706 4 party walls requires 3-hr, but footnote “a” reduces to 2-hr But the north and south walls are within 10’ from the property line, are they required to be 1-hr as per Table 602? OR is it because the west wall abuts at 90 degrees then the north south wall is protected by the 2-hr west wall?




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer