companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

IBC TEXTILES

SAINT-LAURENT-Canada

Company Name:
Corporate Name:
IBC TEXTILES
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 2035 Ch De La Cote-De-Liesse,SAINT-LAURENT,QC,Canada 
ZIP Code:
Postal Code:
H4N 
Telephone Number: 5143333277 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
233540 
USA SIC Description:
TEXTILE BROKERS 
Number of Employees:
 
Sales Amount:
$5 to 10 million 
Credit History:
Credit Report:
Good 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
IBRIS INC
IBRAHIM, ERIC DVM
IBC TEXTILES INC
Next company profile:
IAN MARTIN LIMITED
IAN MARTIN
IAMAW










Company News:
  • Area Calculation Clarification - The Building Code Forum
    I have a somewhat basic (dumb?) question about area calculations - Reading through the 2009 IBC it defines building area as: 502 1AREA, BUILDING The area included within surrounding exterior walls (or exterior walls and fire walls) exclusive of vent shafts and courts Areas of the building
  • Fire rating of electrical equipment rooms - The Building Code Forum
    Could anyone direct me to an IBC or NFPA code regarding the rating of electrical equipment rooms In our jurisdiction, we routinely expect at least a
  • Door Encroachment Into Egress Corridor - The Building Code Forum
    IBC 2012 1005 7 1 states "Doors, when fully opened, shall not reduce the required width by more than 7 inches " If I have a door that when swung open 180 degrees is clear of the required corridor width, but when open at 90 degrees encroaches more than 7" into the required corridor width, is it
  • Fire Separation Distance Between New and Existing Building with Windows
    From the 2021 IBC Commentary: The Commentary says: Fire separation distance is the distance from the exterior wall of the building to one of the three following locations, measured perpendicular to the exterior wall face: an interior lot line [see Commentary Figure 202 (19)]; the centerline of a street or public way [see
  • Occupancy Classification for Townhouse: R-2 or R-3?
    R-2: "Residential occupancies containing more than two dwelling units" If each townhouse is a seperate structure, than it only contains one dwelling unit That makes it R-3, yes?
  • Shaft vs. Chase - The Building Code Forum
    The term "chase" isn't defined in the IBC and the term "chases" is only mentioned 3 times (408 5 2, 2104 1 4, and 3412 6 3 (2012 IBC)) I find UL listings for both chases and shafts and I hear chase used in the field more than shaft So are the two terms speaking of the same thing (if not then
  • Egress through Intervening Spaces - The Building Code Forum
    It was mentioned that the path cannot cross through intervening spaces The large room is the Multipurpose Gym I've been making evac signs as such for a while and this is the first I've heard of it Reading the building code for this is extremely confusing the way they word things and was hoping someone might be able to shed some light 1016 2Egress through intervening spaces Egress through
  • Toe Board Requirement - The Building Code Forum
    I cannot seem to find the reference for a toe board requirement in IBC 2012 I was thinking it would be in IBC 1013 Guards, but I am not seeing it now I thought I recalled reading that a 4" toe board is required on a open edge of a walking surfaces, mezzanines, equipment platforms, stairs
  • 67 accessibility turning circle - exact code location?
    I have just become aware of the transition to a larger turning circle for mobility devices I see general diagram and reference to ICC A117 1, but that does not seem to be an actual code designation Can someone point e to the exact code area in the IBC 2021 or the NFPA 101 that details this
  • Hallway vs corridor - The Building Code Forum
    A hallway was originally provided for in the 1997 UBC The IBC got away from that It is now either a rated corridor or an unrated corridor A corridor is defined as "an enclosed exit access component that defines and provides a path of egress travel to an exit A hallway fits that definition, therefore, a hallway is a corridor Depending on the occupancy group, occupant load, and whether the




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer