copy and paste this google map to your website or blog!
Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples: WordPress Example, Blogger Example)
I-405 Renton to Bellevue Widening and Express Toll Lanes Project | WSDOT Travelers should plan for the southbound I-405 off-ramp to North Southport Drive (Exit 5) to be closed from Aug 8-11 Crews will be performing drainage work The southbound I-405 off-ramp to North Southport Drive (Exit 5) will be closed from 10 p m Friday, Aug 8, to 5 a m Monday, Aug 11 A signed detour route will be in place
I-405 between Renton, Bellevue closed this weekend | FOX 13 Seattle The Brief Northbound I-405 between Renton and Bellevue will be closed this weekend WSDOT is encouraging drivers to seek alternative routes this Father's Day Weekend The project is a major upgrade to fix one of the state's worst bottlenecks, with a focus on smoother commutes
Southbound I-405 to close this week for construction - MSN The closure is due to the I-405 Renton to Bellevue Widening and Express Toll Lanes project, which will add new capacity between SR 167 in Renton and Northeast Sixth Street in Bellevue One new
I-405 weekend closures scheduled for this summer in Renton • July 11-14: Northbound I-405 will be closed from Maple Valley Highway SR 169 (Exit 4) to Southport Drive (Exit 5) • July 18-21: Northeast 44th Street (near Exit 7) will be closed east of Lake Washington Boulevard Northeast • Aug 1-4: Southbound I-405 from Southport Drive (Exit 5) to Sunset Blvd SR 169 (Exit 4) on-ramp
WSDOT Travel Advisory: Northbound I-405 in Renton closed for paving . . . RENTON – Northbound Interstate 405 in Renton will be fully closed from June 13-16 Contractor crews will conduct paving and install drainage crossings and noise wall panels, as part of the I-405 Renton to Bellevue Widening and Express Toll Lanes Project
Northbound I-405 closed this weekend between Renton and Bellevue All lanes of northbound I-405 will be fully closed between North Southport Drive Sunset Boulevard Northeast SR 900 (milepost 5) to Coal Creek Parkway Southeast (milepost 10) beginning at 11:30 p m Friday, June 13, through 4 a m Monday, June 16