companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

RIVER CITY SOFTWARE ASSOCIATES

EDENTON-USA

Company Name:
Corporate Name:
RIVER CITY SOFTWARE ASSOCIATES
Company Title: River City Software Associate LTD 
Company Description: rcsal provides custom and off the shelf programs for corporate pbx systems. products include pbx administration, alarm maintenance, e911 reporting and terminal emulation. 
Keywords to Search: river city software, terranova, rcsal, rcsal, 
Company Address: 101 River Drive,EDENTON,NC,USA 
ZIP Code:
Postal Code:
27944 
Telephone Number: 2524264700 (+1-252-426-4700) 
Fax Number:  
Website:
rcsal. com 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
861102 
USA SIC Description:
Associations 
Number of Employees:
 
Sales Amount:
 
Credit History:
Credit Report:
 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
SIGN SHOP
FLOWER PATCH
ERAALLSEASONSREALTY
Next company profile:
NORTH CAROLINAS NORTHEAST PARTNERSHIP
KEN ELLIOTT
DIGITAL GRAPHETTI










Company News:
  • Solved (7\%) Problem 14: A boat can be rowed at a speed of - Chegg
    Science Physics Physics questions and answers (7\%) Problem 14: A boat can be rowed at a speed of 9 38 km h in still water The boat is in a river that moves at a speed of 3 61 km h The river is 0 52 km wide and flows in a straight line and has straight banks 17% Part (a) How much time, in minutes, is required to row 1 96 km downstream (with the flow) in the river? t=9 000 Correct! 17% Part
  • Solved Q3. The initial ultimate BOD after mixing of the - Chegg
    The initial ultimate BOD after mixing of the Bergelmir River is 12 0 mg L The DO in the Bergelmir River after the wastewater and river have mixed is at saturation
  • Solved The Hoover Dam backs up the Colorado River and - Chegg
    Question: The Hoover Dam backs up the Colorado River and creates Lake Meade, which is approximately 115 miles long and has a surface area of approximately 225 square miles If during flood conditions the Colorado River flows into the lake at a rate of 45,000 cfs and the outflow from the dam is 8000 cfs, how many feet per 24-hr day will the lake level rise?
  • Solved The initial ultimate BOD after mixing of the Noir - Chegg
    The initial ultimate BOD after mixing of the Noir River is 50 mg L The DO in the river after the wastewater and river have mixed is at saturation The river temperature is 10 degree C At 10 degree C, the deoxygenation rate constant k_d is 0 30 d^-1 and the reaeration rate constant k_r is 0 30 d^-1
  • Solved River Community Hospital is a 210-bed, | Chegg. com
    River Community Hospital is a 210-bed, not-for-profit, acute care hospital with a long-standing reputation for providing quality healthcare services to a growing service area
  • Solved 2. 10. 4 WP Figure P2. 10. 4 shows a cross section of a - Chegg
    2 10 4 WP Figure P2 10 4 shows a cross section of a submerged tunnel used by automobiles to travel under a river Find the magnitude and location of the resultant hydrostatic force on the circular roof of the tunnel
  • Solved Cooper River Glass Works (CRGW) produces four - Chegg
    Question: Cooper River Glass Works (CRGW) produces four different models of desk lamps as shown on the flowchart The operations manager knows that total monthly demand exceeds the capacity available for production Thus, she is interested in determining the product mix which will maximize profits Each model's price, routing, processing times, and material cost
  • Solved The initial ultimate BOD after mixing of the | Chegg. com
    The initial ultimate BOD after mixing of the Bergelmir River is 12 0mg⋅L−1 The DO in the Bergelmir River after the wastewater and river have mixed is at a saturation concentration of 10 15mg L
  • Solved A river with 400 ppm of salts (a conservative | Chegg. com
    A river with 400 ppm of salts (a conservative substance) and an upstream flow of 25 0 m 3 s receives an agricultural discharge of 5 0 m 3 s carrying 2,000 mg L of salts The salts quickly become uniformly distributed in the river
  • Solved Consider a river flowing toward a lake at an average - Chegg
    Consider a river flowing toward a lake at an average velocity of 3 m s at a rate of 500 m3 s at a location 90 m above the lake surface Determine the total mechanical energy of the river water per unit mass and the power generation potential of the entire river at that location




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer