companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

TERRATANK ENVIRONMENTAL GROUP

WOODBRIDGE-Canada

Company Name:
Corporate Name:
TERRATANK ENVIRONMENTAL GROUP
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 111 Regina Rd,WOODBRIDGE,ON,Canada 
ZIP Code:
Postal Code:
L4L 
Telephone Number: 9052647949 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
228720 
USA SIC Description:
TANKS INSTALLATION & REMOVAL 
Number of Employees:
 
Sales Amount:
$1 to 2.5 million 
Credit History:
Credit Report:
Unknown 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
TEXAS PIT
TESORO JEWELLERY & ACCESSORIES INC
TERSINGNI L & M
Next company profile:
TERRACOTA MASONRY INC
TERRACOTA MASONRY INC
TERRACES ON THE GREEN










Company News:
  • Confirmatory Survey Results for Class 1 and Class 2 Interior Building . . .
    SMUD used site-specific supplemental DCGLs for Co-60 and Cs-137 for determining surface release criteria (SMUD 2006a and b) ORISE judgmentally selected five grid blocks for confirmatory surveys based upon final status survey (FSS) results which approached unity
  • SMUD Community Renewable Energy Deployment Final Report
    This report summarizes the completion of four renewable energy installations supported by California Energy Commission (CEC) grant number CEC Grant PIR-11-005, the US Department of Energy (DOE) Assistance Agreement, DE-EE0003070, and the Sacramento Municipal Utility District (SMUD) Community Renewable Energy Deployment (CRED) program The funding from the DOE, combined with funding from the
  • Simulation of the Secondary Frequency Control Capability of the . . .
    The Sacramento Municipal Utility District (SMUD), as a typical balancing authority and project team member, was suggested by the Advanced Technology Modeling TFG for testing the models of the advanced pump storage hydro technology newly developed in the course of the DOE project and for demonstration of the potential benefits of this technology
  • Design and field performance of the KENETECH photovoltaic inverter . . .
    KENETECH PV inverter systems are now in successful operation at the Sacramento Municipal Utility District`s (SMUD) Hedge Substation and the PVUSA-Davis site, with additional systems scheduled to be placed into service by the end of 1995 at SMUD, the New York Power Authority, Xerox Corporation`s Clean Air Now project, and the Georgia Tech
  • Iowa Hill Pumped Storage Project Investigations - Final Technical . . .
    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD) The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s
  • Construction Support for New Slab Creek Powerhouse Project (Final . . .
    The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1 5 million Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft Water is conveyed from
  • Evaluating Tunable Lighting in Classrooms: Trial LED lighting systems . . .
    This report summarizes the results from a trial installation of light-emitting diode (LED) lighting systems installed in three classrooms at Gold Ridge Elementary (GRE) School in the Folsom Cordova Unified School District (FCUSD) in Folsom, CA FCUSD asked the Sacramento Utility District (SMUD) to help them explore potential benefits of tunable-white lighting systems for children with Autism
  • Small Business Demand Response with Communicating Thermostats: SMUDs . . .
    Small Business Demand Response with Communicating Thermostats: SMUD's Summer Solutions Research Pilot
  • Confirmatory Survey Results for the Auxiliary Building
    SMUD used site-specific supplemental DCGLs for Co-60 and Cs-137 for determining surface release criteria The applicable surface activity guidelines for the structural surfaces within specific rooms survey units within the Auxiliary Building are provided in Table 6
  • Mechanical cutting of irradiated reactor internal components
    Mechanical cutting methods to volume reduce and package reactor internal components are now a viable solution for stakeholders challenged with the retirement of first generation nuclear facilities The recent completion of the removal of the Reactor Vessel Internals (RVI) from within the Sacramento Municipal Utility District's (SMUD) Rancho Seco Nuclear Power Plant demonstrates that unlike




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer