copy and paste this google map to your website or blog!
Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples: WordPress Example, Blogger Example)
CIVCAST | Advertise, Manage, and Receive Construction Bids and RFQs Webber Waterworks is requesting proposals from interested subcontractors to perform specified scopes of supply on the construction of the Dr Paul Phillips Water Purification Plant (DPPWPP) Expansion Project, a brownfield expansion from 14 0 MGD to 18 0 MGD peak daily flow (PDF) water purification plant with provisions for a future expansion to
Weatherford Cover Page The Dr Paul Phillips Water Purification Plant ("WPP") has a rated capacity of 14 million gallons per day ("MGD") A preliminary engineering report ("PER") for expansion of the WPP was completed in September 2021 that identified overall improvements needed at the WPP to expand to 18 MGD, and later to 22 MGD
Dr. Paul Phillips Water Purification Plant Expansion to 18 MGD Background Information : The Owner owns and operates the Dr Paul Phillips Water Purification Plant (WPP) located at 118 W Lake Drive, Weatherford, Texas 76087 in Parker County The purpose of the Project is to increase total capacity of the WPP from 14 to 18 MGD, with provisions for a future expansion to 22 MGD
Construction Manager at Rick (CMAR), Pre-Construction and Construction . . . Dr Paul Phillips Water Purification Plant 118 W Lake Drive Weatherford, Texas 76087 Two (2) mandatory pre-bid dates: 1) 10:00am, November 28, 2023, and 2) 2:00pm, December 6, 2023 Estimate: $83 Million Trades: *At Risk Construction Management CMAR
2) CALL TO ORDER ANNOUNCEMENT OF A QUORUM - weatherford. granicus. com cking promissory note 6 c) Discus and or consider an amendment to the agreement with PLW Waterworks, LLC to establish an initial guaranteed maximum price not to exceed $9,573,548 33 for the Dr Paul Phillips Water Purification Plant Expansion to 18 MGD project, thereby increasing the total contract value to a not to exceed amount of $10,226,623 33
phillips water purification Bids, RFP Government Contracts Paul PhillipsWaterPurification Plant and pump station Bidders are not required to bid on all chemicals listed; a “No Bid” entry on the chemicals that are not being bid on is acceptable All bids are due back to the City of Weatherford as specified on the bid form
Current Projects | Weatherford, TX - Official Website WWTP Master Plan and WWTP PFAS Planning Evaluation Current Development Projects Current Residential Projects Current Commercial Projects Current City Projects Under Construction: South Holland Lake Creek Stabilization Lift Station 26 Dr Paul Philips Water Purification Plant Taste and Odor Treatment Center Point Wastewater Line
CIVCAST | Advertise, Manage, and Receive Construction Bids and RFQs PLW Waterworks is requesting proposals from interested suppliers and subcontractors to perform specified scopes of supply on the construction of the Dr Paul Phillips Water Purification Plant (DPPWPP) Expansion Project, a brownfield expansion from 14 0 MGD to 18 0 MGD average daily flow (ADF) water purification plant with provisions for a