companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

UNIFORM & CO

WINNIPEG-Canada

Company Name:
Corporate Name:
UNIFORM & CO
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 675 Empress St,WINNIPEG,MB,Canada 
ZIP Code:
Postal Code:
R3G 
Telephone Number: 2047755412 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
0 
USA SIC Description:
SNOWBOARD EQUIP 
Number of Employees:
 
Sales Amount:
 
Credit History:
Credit Report:
 
Contact Person:
 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
UNIGLOBE DESTINATION TRAVEL GROUP
UNIFORMSBYRAYHIGGINSCOM
UNIFORMS BY RAY HIGGINS
Next company profile:
UNIFLYTE CO LTD
UNIES LIMITED
UNIES LTD










Company News:
  • In Resource Leveling - Civil4M
    In Resource Leveling - (a) Total duration Of Project is Reduced (b) Total duration Of Project is Increased (c) Uniform Demand of Resources is achieved (d) Cost of Project is Controlled The correct Answer Is (c) Uniform Demand of Resources is achieved
  • Understanding The Concrete Grades, Concrete Mix Ratios Applications . . .
    Be it a country road in Madhya Pradesh, a metro terminus in Gujarat, or an apartment complex in Delhi, there is one thing that is uniform—the demand for the right concrete mix ratio The hardness, durability, and lifespan of a building are highly reliant on the proportion of the concrete used
  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the direction and magnitude of the velocity at all points are identical (b) the velocity of successive fluid pai-ticles, at any point, is the same at suc¬cessive periods of time (c) the magnitude and direction of the velocity do not change from point to point
  • Stone - Stone masonry made from uniform sized and coursed . . . - Civil4M
    Stone masonry made from uniform sized and coursed stones joined with mortar and fine finished is called - (a) ashlar masonry (b) simple stone masonry (c) rubble masonry (d) none of the above The correct Answer Is (a) ashlar masonry
  • Work procedure for floor and wall tiling - Civil4M
    2 In order to obtain uniform tonality, it is recommended to mix tiles from different boxes for laying to great, harmonious tonality 3 Backing plaster shall be initially carried out on the brick block walls so as to achieve a background that is fairly to plumb and at right angles in all corners
  • Work method statement of brick and rubble masonry - Civil4M
    Work method statement of brick and rubble masonry SCOPE PURPOSE: Bricks shall be sound,hard,well-burnt , uniform in size, shape colour ,homogeneous in texture, giving a metallic ringing sound, free from flaws, cracks, holes, lumps or grit and arises should be square, straight and sharply
  • Checklist for all kinds of tiling works including grouting . . . - Civil4M
    Uniform compaction with straight edge flat shovel has been ensured Floor Tiling Work Pre Execution Checks: Are all the required tools available at site? The surface on which tiles to be laid made moist, free from dust and other contaminations The plan setting out for tiling done All the tiles are of required dimensions
  • Why we do PCC before footings? - Civil4M
    In any construction project, after excavation, PCC is done before footing Why we do PCC at the base of footing, PCC have lower strength than concrete and it is placed at base?
  • Uniform flow occurs when | Civil4M
    Uniform flow occurs when (a) the flow is steady (b) the flow is streamline (c) size and shape of the cross section in a particular length remain constant (d) size and cross section change uniform¬ly along length (e) flow occurs at constant fate The correct Answer Is (c) size and
  • What do you mean by graded aggregate and a single-sized . . . - Civil4M
    Graded aggregate means using different size of aggregates so as to have a uniform consistency in concrete Different sizes of aggregate will fill the gap and achieve higher strength




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer