is there any possibility to obtain m-50 result by hand mixing There is every possibility of achieving M50 result by hand mixing Step 1: Mix design for the said grade to be prepared Step 2: Hand mixing involving turning over the dry mixture from one end of the mixing tray or platform to the other end completely so as to get the uniform mixing of the concrete ingredients Step 3: Adding water as per the design mix part by part to this dry mixed concrete
How do I calculate the required numbers of cover blocks Go to your Project actual execution of work, then tell them to put the cove blocks in place as per what you think is sufficient for horizontal surfaces like slab then walk on it or do some movement which may happen during concreting and check if still you able to find a uniform covering to reinforcement, if cover to reinforcement is still seen uniform then you have placed required number of
General energy equation holds for | Civil4M General energy equation holds for (a) steady flow (b) turbulent flow (c) laminar flow (d) non-uniform flow (e) all of the above The correct Answer Is (d) non-uniform flow
Detailed work procedure for wood work - Civil4M Door shutters should close without nudging and a uniform gap should be visible between the door frame and shutter The horizontal and vertical gap between the door frame and plastered wall should be filled with silicone sealant Tools to be used for Quality Inspection Plumb bob Spirit levels 1-2m Right angles Approved drawings and schedule of
Civil,engineering interview questions | Civil4M commonly asked questions in a civil engineering interview1 What is BM , shear force ? 2 If your an engineer and you have to construct dam, which place you choose ,how much scale you design and why? 3 Type of footing, which footing sutaible for which soil,n structure? 4 recording and non recording type of rain gauge? 5 different chemical contents in drinking water,sewage water and raw water 6
The flow in which each liquid particle has a definite path and their . . . The flow in which each liquid particle has a definite path and their paths do not cross each other is called (a) one dimensional flow (b) uniform flow (c) steady flow (d) turbulent flow (e) streamline flow The correct Answer Is (e) streamline flow
What is Maximum Flyash Content in Concrete mix design I want to know As per IS codes what is the maximum flyash content i can add into concrete as a replacement of Cement Can i add flyash beyond the limit specified in IS code This is important interview question, i want correct answer for it