companydirectorylist.com  Global Business Directories and Company Directories
Search Business,Company,Industry :


Country Lists
USA Company Directories
Canada Business Lists
Australia Business Directories
France Company Lists
Italy Company Lists
Spain Company Directories
Switzerland Business Lists
Austria Company Directories
Belgium Business Directories
Hong Kong Company Lists
China Business Lists
Taiwan Company Lists
United Arab Emirates Company Directories


Industry Catalogs
USA Industry Directories












Company Directories & Business Directories

UNIFORM EXPRESS THUNDER BAY

THUNDER BAY-Canada

Company Name:
Corporate Name:
UNIFORM EXPRESS THUNDER BAY
Company Title:  
Company Description:  
Keywords to Search:  
Company Address: 1218 Amber Dr,THUNDER BAY,ON,Canada 
ZIP Code:
Postal Code:
P7B6M5 
Telephone Number: 8073459711 
Fax Number:  
Website:
 
Email:
 
USA SIC Code(Standard Industrial Classification Code):
569922 
USA SIC Description:
Uniforms 
Number of Employees:
5 to 9 
Sales Amount:
$1 to 2.5 million 
Credit History:
Credit Report:
Very Good 
Contact Person:
Paula Sklazeski 
Remove my name



copy and paste this google map to your website or blog!

Press copy button and paste into your blog or website.
(Please switch to 'HTML' mode when posting into your blog. Examples:
WordPress Example, Blogger Example)









Input Form:Deal with this potential dealer,buyer,seller,supplier,manufacturer,exporter,importer

(Any information to deal,buy, sell, quote for products or service)

Your Subject:
Your Comment or Review:
Security Code:



Previous company profile:
UNION ENERGY
UNIFORMS PLUS
UNIFORMS PLUS
Next company profile:
UNDERGROUND GYM AND YOUTH CENTRE
UNDERGROUND INK
UNCLE FRANKS SUPPER CLUB










Company News:
  • is there any possibility to obtain m-50 result by hand mixing
    There is every possibility of achieving M50 result by hand mixing Step 1: Mix design for the said grade to be prepared Step 2: Hand mixing involving turning over the dry mixture from one end of the mixing tray or platform to the other end completely so as to get the uniform mixing of the concrete ingredients Step 3: Adding water as per the design mix part by part to this dry mixed concrete
  • How do I calculate the required numbers of cover blocks
    Go to your Project actual execution of work, then tell them to put the cove blocks in place as per what you think is sufficient for horizontal surfaces like slab then walk on it or do some movement which may happen during concreting and check if still you able to find a uniform covering to reinforcement, if cover to reinforcement is still seen uniform then you have placed required number of
  • General energy equation holds for | Civil4M
    General energy equation holds for (a) steady flow (b) turbulent flow (c) laminar flow (d) non-uniform flow (e) all of the above The correct Answer Is (d) non-uniform flow
  • The contact pressure of rigid footing on cohesive soils is
    The contact pressure of rigid footing on cohesive soils is 1] more in the centre than at the edges 2] less in the centre than at the edges 3] uniform
  • A soil having particles of nearly the same size is known as
    A soil having particles of nearly the same size is known as 1] uniform soil 2] poor soil 3] well graded soil 4] coarse soil
  • Detailed work procedure for wood work - Civil4M
    Door shutters should close without nudging and a uniform gap should be visible between the door frame and shutter The horizontal and vertical gap between the door frame and plastered wall should be filled with silicone sealant Tools to be used for Quality Inspection Plumb bob Spirit levels 1-2m Right angles Approved drawings and schedule of
  • Civil,engineering interview questions | Civil4M
    commonly asked questions in a civil engineering interview1 What is BM , shear force ? 2 If your an engineer and you have to construct dam, which place you choose ,how much scale you design and why? 3 Type of footing, which footing sutaible for which soil,n structure? 4 recording and non recording type of rain gauge? 5 different chemical contents in drinking water,sewage water and raw water 6
  • The flow in which each liquid particle has a definite path and their . . .
    The flow in which each liquid particle has a definite path and their paths do not cross each other is called (a) one dimensional flow (b) uniform flow (c) steady flow (d) turbulent flow (e) streamline flow The correct Answer Is (e) streamline flow
  • The normal stress in a fluid will be constant in all directions at a . . .
    The normal stress in a fluid will be constant in all directions at a point only if (a) it is incompressible (b) it has uniform viscosity (c) it has
  • What is Maximum Flyash Content in Concrete mix design
    I want to know As per IS codes what is the maximum flyash content i can add into concrete as a replacement of Cement Can i add flyash beyond the limit specified in IS code This is important interview question, i want correct answer for it




Business Directories,Company Directories
Business Directories,Company Directories copyright ©2005-2012 
disclaimer